3rd Party Support

Feature Projects

3rd Party International Support - Knight Piésold

closure kp yang tse myanmar

Myanmar Yang Tse Copper Limited (MYTCL) requested that Knight Piésold develop a detailed pit closure plan for the Sabetaung Pit at the S&K Copper Mine located in Myanmar following the earlier development of a preliminary pit closure plan. The S&K operation completed mining of the Sabetaung South Pit in late 2013 and the Sabetaung Pit in August 2014.


The pit will be backfilled, at least in part, with mine waste material that could include potentially acid forming (PAF) waste, as part of the pit closure plan. In order to reduce the migration of acid rock drainage (ARD) from the pit into an adjacent aquifer in the longer term, the PAF waste will need to be hydraulically isolated from the regional groundwater system. This document comprises a detailed pit closure report that will form part of the overall site closure plan.

Read the full article & Knight Piésold Detailed Mine Closure Plan

 

 

 

 

feed-image
Share to Facebook Share to Twitter Share to Linkedin Share to Delicious 

Newsletter Subscription

Subscribe

Subscribe here to receive our monthly newsletter directly to your mailbox.

Yangon Port Office
70 (i) Bo Chein Street
Pyay Road, Hlaing Township
Yangon, Myanmar
Tel: (951) 514 194 -7
Fax: (951) 514 208
MYTCL-Logo-Footter
Monywa Site Headquarters
Salingyi Township
Sagaing Region
 Myanmar
Tel: (9571) 222 26
Fax: (9571) 225 22